Byucksan Engineering Infrastructure

Railway Field : Urban Railway (LRT)

Seongnam-Yeoju Double-Track Railway Section 1 Roadbed Basic and Detailed Design
Location : Seongnam-si, Gyeonggi-do
Client : Korea Rail Network Authority
Period : 2004.12 ~ 2006.12
Scope
  • - Length : L=0.744km
  • - Structure Design : 0.7441km (Open Cut : 453.383m, NATM : 290.757m)
  • - Main Line Ventilation Shaft : 1 place
  • - Preparation of Licensing Documents 1 Lot
Ilsan Line Wonheung (Tentative) Station New Construction Roadbed Detailed Design
Location : Ilsan-si, Gyeonggi-do
Client : Korea Rail Network Authority
Period : 2009.09 ~ 2010.12
Scope
  • - Length : L=0.208km
  • - Structure Detailed Design : 0.208km
  • - Preliminary Disaster Impact Assessment : 1 Lot
  • - Project Implementation Plan Approval Document Preparation : 1 Lot
Total 25
발주처
한국철도시설공단
사업명
진접선(당고개~진접) 복선전철 제1공구 건설공사
수행년도
2015.07 ~ 2019.04
발주처
한국철도시설공단
사업명
김포도시철도 제1공구 노반건설공사 전면책임감리용역
수행년도
2014.07 ~ 2018.02
발주처
포스코건설
사업명
진접선(당고개~진접) 복선전철 제4공구 건설공사 기본 및 실시설계(T/K)
수행년도
2014.07 ~ 2015.03
발주처
현대산업개발
사업명
김포도시철도 제4공구 노반 건설공사 기본 및 실시설계(T/K)
수행년도
2013.07 ~ 2014.06
발주처
서울시 도시기반시설본부
사업명
서울지하철 9호선 3단계 920공구 건설공사 전면책임감리용역
수행년도
2009.11 ~ 2018.12
발주처
한국철도시설공단
사업명
일산선 원흥(가칭)역 신설 노반 실시설계
수행년도
2009.09 ~ 2010.12
발주처
서울시 도시철도건설본부
사업명
발산외6역 승강편의시설 설치공사 실시설계 용역
수행년도
2009.08 ~ 2010.12
발주처
인천시 도시철도건설본부
사업명
인천도시철도 2호선 건설공사 제4감리 전면책임감리용역
수행년도
2009.04 ~ 2016.11
발주처
한국철도공사
사업명
일산선 대화역외 4개역 승강기구조물 설치 및 건축마감기타공사 전면책임감리용역
수행년도
2009.03 ~ 2009.12
발주처
한국철도공사
사업명
분당선 수내역외 2개역 승강기구조물 설치 및 건축마감기타공사 전면책임감리용역
수행년도
2008.07 ~ 2010.10